Alagna Family
Construction progress of our new home
on Clyde Ln. Palmetto Hall
This page is dedicated to the process of building our new home in Palmetto Hall Plantation on Hilton Head. We started construction on February 1st or so 2005. We anticipate that it will take about 10-months to complete the process. We are the General Contractors on this project and will oversee it till it completion. We will be working with our hired sub contractors and hope to get a quality home, where we want at a reasonable cost.

This is the lot after we removed the trees and the fill dirt was just spread out.

Then arrived the concrete and the crews.

This room is the "Carolina room" or screened -in porch.

This area is the guest bedroom suite and the kitchen.

This is a view from the back looking towards the street.

Almost done with the pouring the concrete.

3-Days into Framing. April 8th, 2005


3-Days into Framing. April 8th, 2005

10-Days into Framing. April 15th, 2005, starting on the second flooring.

April 15th interior shot looking down the hallway towards the kitchen.

15-Days into Framing. April 19th, 2005, starting on the roof rafters.

April 19th, 2005, front entrance view.

April 19th, 2005, guest suite above garage.

April 19th, 2005, rear elevation view from the fairway.

April 29th, 2005, (tens days later) 24-days into the job actually 18 working days because no work allowed on weekends. Rear elevation view from the fairway.

April 29th, 2005, view from the rear patio into the Carolina room and Kitchen.

April 29th, 2005, view from curb.

April 29th, 2005, curbside the second floor rafters are all in. You can see the 4x8 plywood has been delivered and is being installed on the roof.

April 29th, 2005, view from the front entryway to the staircase upstairs. Our framer is Jim Bevan and he is excellent to work with and very talented at his trade as a framer.


May 7th - home is now enclosed and windows remain to be set, our next step is to bring in the trim crew to install the facia and soffit and install the roof shingles.

May 15, 3 1/2 months since start of construction. The front, you can see the sand for the stucco has been delivered and the boards for the facia and soffit. The skylights have also been installed. You can also see that the windows have been set.

May 15th from the golf course. At this point the roof shingles have been installed and the home wrap has been applied. The stucco crew is now building the scaffolding to apply the stucco.

May 15 - interior image from the Family Room looking out towards the front door. The kitchen is to the left and our bedroom is to the right.

This view is looking into the kitchen from the Family Room.

Cara was home for a weekend and we took this image from the upstairs Family Room.

August 14 the front of the home is finally "coming together". As you can see the stucco is pretty much complete.

Rear of the home is almost complete as well.

August 1, 2005 the insulation has now been installed and is ready for the drywall.

The drywall is installed (front entryway) and they are now applying the tape and mud on the walls.

August 15, View into the family room and kitchen.

August 20th view from Family Room into Kitchen and Carolina Room (screened-in porch)

August 20th view from the upstairs family room, the view out the window is to the golf course and rear of home.

August 20th view from the upstairs family room to the front entryway door.

Family room. September 29th

Kitchen with cabinets installed. September 29th

Master Bathroom with saternia installed. September 29th

View from kitchen to family room. September 29th

Entryway walls and trim are primed .September 29th

Bonus room above garage. September 29th

Exterior service yards, soffit and facia painted and lights installed. September 29th

Rear of home soffit and facia painted. September 29th

November 1st Granite Counters installed and paint on walls and ceilings.

November 1st View from Family Rooms to Kitchen

November 1st This is the new brick stoop on the front porch.

November 1st Entryway, railing installed

November 1st Front of home

November 1st View from Kitchen to Family Room, Family Room cabinets installed.

December 20, 2005 Front

December 20, 2005 Rear

Master Bedroom

Kitchen

Family Room